Church Stretton School

A complete turnkey project, that involved stripping out of the existing furniture and the existing mechanical and electrical components.

Due to the condition of the existing floor a new raised floor was installed, consisting of timber joists and plywood base. This was then covered with Polyflor XL Vinyl flooring with fully welded seams.

The project comprised of;

  • The room was prepared and decorated.
  • New floor installed and covered with Vinyl.
  • Furniture was manufactured and installed.
  • New Sinks, Taps and Mechanical Services, including gas were installed.
  • The existing electrical system was upgraded and new electrical services installed where necessary.

The whole project was completed in 5 weeks.